October 12, 2026: NTPC Limited subsidiary NTPC Green Energy Limited (NGEL) declared the commercial operation of a 66.18 MW solar capacity block in Bikaner, Rajasthan, effective October 10, 2026. This addition marks the fourth part of the Kalasar Solar Energy Project, contributing to the broader renewable energy infrastructure of the NTPC group.
The newly operational capacity is part of the 650 MW solar component under the 500 MW REMCL RTC Project managed by NTPC Renewable Energy Limited, a wholly owned subsidiary of NGEL. The declaration was made in compliance with Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
Capacity Updates
With the commissioning of this new block, the total installed capacity of the NTPC Green Energy Limited group has increased to 11,328.69 MW. The current commercial capacity of the NGEL group stands at 11,262.51 MW. At the parent company level, the total installed capacity of the entire NTPC group now stands at 91,572 MW, with a commercial capacity of 90,492 MW.
(Source: Scan X)
To download the latest issue 'Volume 33 Issue 12 - September 25, 2026', click here |